Grenfell Tower

Project:
Grenfell Tower
Value:
Undisclosed
Duration
Ongoing
Nature:
Dangerous Structure / Temporary Works
Client:
RBKC

About the Project

Deconstruct have been providing responsive dangerous structure services to the Royal Borough of Kensington and Chelsea following the tragic events at Grenfell Tower in June 2017. Deconstruct have had a presence on site since the incident, this has included:

- Securing the site

- Structural Assessment

- Design of suitable temporary works solutions to stabilise the structure

- Temporary works installation

- Assisting USAR and Emergency services

- Enabling Works

Working closely with the District Surveyor, HSE and Local Stakeholders, Deconstruct have ensured the stability of structure to enable safe access and the on-going investigations continue unabated.

 Our hearts, thoughts and respect will always be with the victims, families and the local community. Grenfell United.

Project Challenges

Click Here to View PDF