As a continuation of our case study on The De Group Piling project at Cambridge House last week, we are highlighting our solution to working with challenging access restrictions.

Early installation of the central tower crane (TC2) was key to the project logistics, but access to this central location was limited by both the 1.2m width of the opening and the distance to the crane position from the remote power pack.